Magnum Long Lead EDC folding knife 01SC080
Specifications
Blade material
8Cr13MoV
Locking mechanism
Slip joint
Opening mechanism
Nail nick
Handle
Micarta
Weight:
2.751 oz
Overall length:
7.24″
Blade length:
3.15″
Length folded:
4.09″
Blade thickness:
0.11″
Country of origin:
China
Other features
Pocket clip
Emission offsetting
Greener use of materials
Sources from nature
Because it's simple yet important
Lamnia's speciality is a selection of more than 5,000 knives and folding knives. We carry hundreds of Scandinavian knives, the famous Finnish Puukko knives among them, folding knives, hunting knives and kitchen cutlery from the world's best brands, such as Spyderco, Cold Steel, Böker, Fox Cutlery and Benchmade.



