Böker Magnum Long Lead EDC folding knife 01SC080
Specifications
Item #
01SC080
Blade material
8Cr13MoV
Locking mechanism
Slip joint
Opening mechanism
Nail nick
Handle
Micarta
Weight:
2.751 oz
Overall length:
7.24″
Blade length:
3.15″
Length folded:
4.09″
Blade thickness:
0.11″
Other features
Pocket clip
Categories
EDC Folding knivesRecommended products
Lamnia is sharp and sustainable
Logistics
Emissions compensation
Packaging
Greener use of materials
Energy
Sources from the nature
Waste utilization
Because it's simple yet important
About Lamnia
Lamnia's speciality is a selection of more than 5000 knives and folding knives. We carry hundreds of scandinavian knives, the famous Finnish Puukko knives among them; folding knives, hunting knives and kitchen cutlery from the world's best brands such as Spyderco, Cold Steel, Roselli, Fox Cutlery and Marttiini.